Jharkhand Power Boost: PVUNL’s 800 MW Unit 2 Ready for Commercial Operation, Adding 1360 MW Total

Jharkhand is set to receive an additional 800 MW of power as the second unit of Patratu Vidyut Utpadan Nigam Limited (PVUNL) successfully completed its full-load trial run. This brings the total power supply from PVUNL to 1,360 MW, significantly boosting the state’s industrial development and power availability.

Sharing Is Caring:

Leave a Comment