As per an MoU, the handover is to take place within 90 days of execution, with Southern Railway continuing train operations and maintenance during a 24-month transition period.
As per an MoU, the handover is to take place within 90 days of execution, with Southern Railway continuing train operations and maintenance during a 24-month transition period.